[today’s run: 3.5 miles]
I finished the interior surface of one shed wall on Sunday. I got the insulation done and put up the two sheets of OSB. That was the north wall.
Before I do the west/back wall I need to make a panel for my antenna cables to exit the building. I plan to use a piece of aluminum. So that is my next task. Maybe I can get something done on that tomorrow. Then I do the OSB and the insulation on that wall.