Categories
home repair Iowa Mississippi

Progress

[Monday: 3 miles; Wednesday: 3 miles; Saturday: 5.14 miles]

Porch progress: this weekend I finished the framing for the two walls with windows. I hope to complete the doorway framing next weekend and get started on exterior sheathing.

Work progress: We are coming to the fall show-and-tell event this week. Most of my stuff is complete but I need to install some software on Monday. If I’m able I would like to get to the office early and get that done.

Also we are exploring the possibility of moving back to Mississippi. The cold winter last year was difficult. It looks like the most convenient time would be at the end of the year. But we have a lot to accomplish before that.