[Today’s run: Silo route — 6 miles]
I checked on my concrete a few times today. For awhile I had it uncovered. I took the forms off. But then I threw some more water on it and covered it back up with plastic. I am going to let it sit for as long as I can stand it.
The next steps are to get my tower pieces all arranged. I should try to measure my current guy wires and see how much more I need to acquire. Also I should trial fit my various tower pieces to see which ones fit together easily.
Here is a picture of Lilly Lake in the fog